HOSTING
Minerset South Carolina Hosting Facility
Q4 2022 Minerset new hosting facility in South Carolina will go live, offering a fully managed 10MW total capacity facility powered by green energy (Nuclear)
Site Highlights
Q4 2022 Minerset new hosting facility in South Carolina will go live, offering a fully managed 10MW total capacity facility powered by green energy (Nuclear)
- 10 1MW mining pods
- Secure perimeter and 24/7 security camera system
- 10MW Facility
- Powered by Green Energy
- 280 S19J Pro 100TH per pod.
- Fully managed with onsite security
- Full remote access
- ₿ 44.3 BTC per pod/year
We’ll setup and link your miner in our dedicated hosting facility
Remote Monitoring
Monitor the status of your equipment from anywhere at any city.
Your earnings are delivered straight to your wallet.
Our hosting plans include electricity and maintenance costs.
Always on hand, we’re available to answer your questions and ensure your mining equipment is always running.
Our dedicated facility is optimised to provide a stable operating temperature for mining at all times.
Pro Hosting
Hosting Options SC10MW-
100 units
Equivalent to 9¢/kWh -
Total hosting $19.9K/mo
Deposit: $59.7K -
S19J Pro 100TH
$820k All-in for 100 miners ($8.2K/miner)
Discounts available under revenue share!
Premium Hosting
Hosting Options SC10MW-
280 units
Equivalent to 8¢/kWh -
Total hosting $50.4K/mo
Deposit: $151.2K -
S19J Pro 100TH
$2.29M for 1MW pod of 280 miners ($8.2K/miner)
Discounts available under revenue share!
Why host with Minerset.com?
Price includes:
- *$8.2K unit price per miner. Breakdown: miner at $7.5K + $500 shipping and $200 setup fee
- Energy access point with electric meter box
- Repairing RMA fees
- 12 mo. manufacturer warranty
- Management fee
- Dashboard software for remote access support
- Full insurance covering all pods and miners (at purchase value)
- 24h surveillance system inside the pods and perimeter
Get in touch with sales
Interested in knowing more about our new facility? Use the form below to get in touch with our sales team or reach us at sales@minerset.com
Frequently Asked Questions
12 months.
No. A 2-month deposit and refundable 1 month
security deposit is required prior to deployment.
No more than 90 days before the end of the current contract.
Not to this South Carolina site but Minerset has other sites that can cater for this.
The site operator will perform diagnostic and repair engineering work if required.
Everything required for the miners to be operational and maintained, please refer to our sample hosting contract for other ad-hoc charges such as repairs etc.
Minerset will be happy to discuss expansion of your mining operation at our sites.
Minerset will accept USD wire or USDT. If you would like to use the BTC mined to cover the monthly hosting fees that can be accommodated too.
Brokers wanting to bring their clients to this site are more than welcome to discuss with the Minerset sales team.