STATISTICS 2019

Order breakdown in 2019

Total # miners sold and shipped so far in 2019: 16,665

Total power consumption of miners shipped: 33.33MW

Total Hash Rate generated by miners shipped: 666.65 PH

STATISTICS 2020

Order breakdown in 2020

Total # miners sold and shipped so far in 2020: 24,000 Total power consumption of miners shipped: 75 MW Total Hash Rate generated by miners shipped: 2640 PH

Frequently Asked Questions

No.  A 2-month deposit and refundable 1 month
security deposit is required prior to deployment.

No more than 90 days before the end of the current contract.

Not to this South Carolina site but Minerset has other sites that can cater for this.

The site operator will perform diagnostic and repair engineering work if required.

Everything required for the miners to be operational and maintained, please refer to our sample hosting contract for other ad-hoc charges such as repairs etc.

Minerset will be happy to discuss expansion of your mining operation at our sites.

Minerset will accept USD wire or USDT. If you would like to use the BTC mined to cover the monthly hosting fees that can be accommodated too.

Brokers wanting to bring their clients to this site are more than welcome to discuss with the Minerset sales team.

Try our Crypto Mining
profit calculator

Minerset official crypto mining profit calculator. Get an instant overview of your daily and monthly profit with our free mining profit calculator.